A weekly round-up of London’s rail transport news…

vlcsnap-2011-05-17-12h57m33s168-500x375

London Underground

TfL commissioner Sir Peter Hendy has said that a southern extension of the Bakerloo line could be completed within the next 15 years. SE1

Mixed Signals: A Small SSR Press Release With Big Implications London Reconnections

Tube worker locked herself in ticket booth to escape racist abuse London24

London Underground drivers earning £50,000 demand pay rise, four-day week and lump sum in 24-hour service transformation row Mirror

TfL takes over Croxley rail link after DfT raises “fundamental concerns” over council’s leadership MayorWatch

Crossrail

Video: £35m flat-pack Crossrail station built in a year Construction Enquirer

The route of Crossrail 2 has been revised following a public consultation. Building

RMD Kwikform has revealed a bespoke wagon wheel formwork for Crossrail tunnel openings. NCE

Mainline/Overground

Man ‘playing guitar on tracks’ holds up rush hour trains in Walthamstow Evening Standard

Final stages of £4.3m project to improve Ealing Broadway station Get West London

Miscellaneous

An international lawyer dodged paying more than £23,000 in train fares over two-and-a-half years using a doctored photo-card. Court News

TfL has been slammed for misleading commuters by stating that Epsom is in London on its website – at the same time as the Surrey market town is battling to finally be included in Zone 6. Local Guardian

…and finally, The untold story of the British Rail logo BT

The image above is from Nov 2013: Dr Who and the Curse of the London Underground

NEWSLETTER

Be the first to know what's on in London, and the latest news published on ianVisits.

You can unsubscribe at any time from my weekly emails.

Tagged with:
SUPPORT THIS WEBSITE

This website has been running now for over a decade, and while advertising revenue contributes to funding the website, it doesn't cover the costs. That is why I have set up a facility with DonorBox where you can contribute to the costs of the website and time invested in writing and research for the news articles.

It's very similar to the way The Guardian and many smaller websites are now seeking to generate an income in the face of rising costs and declining advertising.

Whether it's a one-off donation or a regular giver, every additional support goes a long way to covering the running costs of this website, and keeping you regularly topped up doses of Londony news and facts.

If you like what you read on here, then please support the website here.

Thank you

2 comments
  1. LadyBracknell says:

    It’s taken a year to build a ‘flat pack’ station? I was out there earlier today on my way to an exhibtion at ExCel and it still seems that there is a lot to do.

    Whilst out that way, I took the opportunity to see how Crossrail is coming on and took the DLR to the next station for a look at the Connaught Tunnel approach. I was surprised by how much I could see, the arches of the tunnel portal are much more visible and the approach seems to have been re-aligned. Work seems to have finished for now and it looks as if the next stage is track laying.

  2. LadyBracknell says:

    If only Epsom was in zone 6 because I could have bought a one day travel card last Saturday instead of being restricted to station to station travel without the option of bus or underground.

Home >> News >> Transport News