Your guide to London's culture and transport news and events taking place across the city.

Your guide to London's culture and transport news and events taking place across the city.

The Hammersmith Flyover

This event has finished Took place on: Tuesday, 18th Apr 2017

 Free

The Hammersmith Flyover forms part of the A4 and is a strategic route from central London to the west. In December 2011 Transport for London’s structural investigations revealed that the post tensioned cables in five of the sixteen spans of the Hammersmith Flyover had deteriorated significantly, leading to the closure of the flyover just before Christmas.

Urgent work was undertaken on these five spans allowing the flyover to fully reopen to traffic in time for the Games in 2012. The second phase of works commenced in October 2013 and completed in September 2015 and introduced additional post tensioning to the remaining eleven spans, replaced the bridge bearings, replaced the drainage system and waterproofed and resurfaced the deck of the flyover.

This presentation will highlight the issues with the existing structure, the works to replace the post tensioning and the problems encountered.

About the speaker

Graham Carter – TfL Programme Manager has worked within the industry for 25 years and has currently been with Transport for London since 2005, responsible for delivering some of Surface Transports largest projects including the £65m Blackwall Tunnel Northbound Refurbishment and the £101m Hammersmith Flyover Strengthening Phase 2.


Contact and Booking Details

This event has finished Took place on: Tuesday, 18th Apr 2017

 Free

Booking details and information at this website.

Reserve tickets at this website

Disclaimer: All information given is correct at the time of compiling the listings. Any questions about the event should be directed to the event organiser. Photos and images used in this listing are supplied by the organiser.

2017-04-18 2017-04-18 Europe/London The Hammersmith Flyover This talk describes the urgent work needed as the old flyover was decaying fast. The work required a high level of cooperation between the client, designer, contractor and key sub-contractors. https://www.ianvisits.co.uk/calendar/2017/04/18/the-hammersmith-flyover-141873 Novotel Hotel,1 Shortlands,,London

Location

Novotel Hotel,

1 Shortlands,
London,
W6 8DR

Map
Map of

Nearest tube and train stations to Novotel Hotel

What else is hapening in London on 18th Apr 2017

NEWSLETTER

Be the first to know what's on in London, and the latest news published on ianVisits.

You can unsubscribe at any time from my weekly emails.