The Northern Line Extension to Battersea has passed a milestone after an engineering train successfully travelled the entire length of the new tunnels from Kennington to Battersea, for the first time.

(c) TfL

The train entered the new 3.2km tunnels at Kennington station, travelling through the newly-constructed step-plate junction that connects the existing Northern line tunnels to the extension.

The engineering train then continued to the new Nine Elms tube station before terminating at the extension’s second new station at Battersea.

Not just for showing off, the train also carried 750 metres of power cable into the extension which was installed by 15 engineers.

The first train to be driven along the full length of the Northern Line Extension marks the completion of the tunnels and track. Work to extend the line now focuses on the fit-out of the new stations, installing the power supply, and extending the signalling used on the Northern line to the extension.

The extension is expected to be completed in autumn 2021, about a year later than originally expected.

(c) TfL

NEWSLETTER

Be the first to know what's on in London, and the latest news published on ianVisits.

You can unsubscribe at any time from my weekly emails.

Tagged with: , ,
SUPPORT THIS WEBSITE

This website has been running now for over a decade, and while advertising revenue contributes to funding the website, it doesn't cover the costs. That is why I have set up a facility with DonorBox where you can contribute to the costs of the website and time invested in writing and research for the news articles.

It's very similar to the way The Guardian and many smaller websites are now seeking to generate an income in the face of rising costs and declining advertising.

Whether it's a one-off donation or a regular giver, every additional support goes a long way to covering the running costs of this website, and keeping you regularly topped up doses of Londony news and facts.

If you like what you read on here, then please support the website here.

Thank you

3 comments
  1. Colin says:

    I love how clinically clean the new installations look.

  2. JP says:

    I wonder how fast it was going, especially if it had a load of cable for ballast. Just coz that beautifully crafted curve between the new stations is crying out for a foot to the floor speed record for a tunnel. Though it would be safer to wait until the mooted extension to the extension gets built so there’d be a decent run off to slow yourself down in.

  3. Geoffrey says:

    The Northern Line now needs to be renamed and split into two lines. There will be no ordinary service via Charing Cross towards Morden in future, they will go to Battersea or terminate in Kennington Loop. I suggest Strand Line for Charing Cross retaining Black colour (coal at Battersea) with Lombard Line with Gold for via Bank. The two/three parts north of Camdem Town would be on both lines with two colours together on maps.

Home >> News >> Transport News