A new housing estate is to be built on a former Dagenham car factory site that sits right next to the Dagenham Dock railway station on the C2C rail line.

Historically the site was primarily used as a press shop to produce vehicle panels for Ford and has a strong industrial history such as the 1968 Ford sewing machinists strike for women’s equal pay and the ‘Made in Dagenham’ movement.

The site, being developed by Peabody, and called Dagenham Green, will see up to 3,502 new homes being built, of which 1,550 will be a mix of London Affordable Rent and London Shared Ownership.

The initial suggested plans are that 1,952 homes from studio to 4-bed will be offered for commercial sale, 775 homes from 1-bed to 4-bed offered at the London Affordable Rent, and 775 homes from 1-bed to 4-bed offered for sale as shared ownership, where people can buy a quarter of the home and rent the rest until they can afford to buy it.

South of the site a new secondary school – using land being transferred to the council from the developer — and an adjacent plot will deliver a minimum of 4,000sqm of industrial workspace. There will also be a 5-acre urban park, which will run alongside the main walking route through the estate.

The lead designer and master planner is PRP Architects and HTA Design is leading the landscape and public realm work.

Sitting right next to Dagenham Dock station on the C2C line, it’s unlikely to be affected by the Beam Park station problems on the neighbouring housing development. There is an agreement though that an east-west route through Dagenham Green could be opened sooner than planned to assist in improving connections with the neighbouring Beam Park housing development if the planned station is definitely cancelled.

Barring local area improvements outside the station, there are no plans to upgrade Dagenham Dock station, which while it has slightly shabby platforms in need of a modest paint job, it does already have full step-free access to both platforms.

The development was approved by Dagenham & Barking council at their latest meeting.

Construction of the Dagenham Green development is expected to start later this year, and be completed in early 2028.

NEWSLETTER

Be the first to know what's on in London, and the latest news published on ianVisits.

You can unsubscribe at any time from my weekly emails.

Tagged with:
SUPPORT THIS WEBSITE

This website has been running now for over a decade, and while advertising revenue contributes to funding the website, it doesn't cover the costs. That is why I have set up a facility with DonorBox where you can contribute to the costs of the website and time invested in writing and research for the news articles.

It's very similar to the way The Guardian and many smaller websites are now seeking to generate an income in the face of rising costs and declining advertising.

Whether it's a one-off donation or a regular giver, every additional support goes a long way to covering the running costs of this website, and keeping you regularly topped up doses of Londony news and facts.

If you like what you read on here, then please support the website here.

Thank you

3 comments
  1. Colin Newman says:

    Barking & Dagenham Council, not “Dagenham & Barking”.

    Barring not Baring

  2. D. Watson says:

    Interesting that all the extra houses been built in both these mentioned developments yet no improvement to road structure that cannot cope with existing traffic level. Car drivers will still be looking to get to work as not all jobs are located at convenient place with easy transport links.

  3. Robert says:

    Interesting. I just hope the Peabody development is more in keeping with the area. As if you know the beam park estate being built next to it. People will be living in high rise rabbit hutches in full view of passengers on the top deck of the 287. What’s worse is the fashion for floor to ceiling windows. I live nearby but I know I can walk around naked in my maisonette. And I’m not scaring anyone!

Home >> News >> Architecture